Skip to content

Cabinetry in London, Ontario

White kitchen cabinets with under-cabinet lighting

What Cabinetry includes

  • Cabinet installation and adjustment
  • Refacing and refinishing
  • Custom built-ins and vanities
  • Hardware upgrades

How we work

  1. Preparation. Tell us about the job. We review photos and details, ask the right questions and give you a clear estimate.
  2. Communication. We agree scope, materials and timing with you and keep you updated as work progresses.
  3. Execution. We do the work carefully, protect your space, clean up and walk you through the result.

Good to know: Refacing can transform a kitchen at a fraction of the cost of replacing every cabinet.

Cabinets are the working part of a room

In a kitchen, a bathroom, a laundry room or a mudroom, cabinets do the daily work. They hold dishes, towels, tools and everything else the room needs, they define the layout, they take the most handling of any element in the house and they are one of the most visible parts of the finish. When cabinets are well designed, well built and well installed, a room works smoothly and looks good for years. When they are not, every door that sticks and every drawer that sags is a daily irritation.

This guide explains how cabinetry works in London, Ontario homes: the types and materials, how to choose between refacing, refinishing and replacing, how installation is done properly, how to plan layouts that work and how to look after your cabinets. For repairs and adjustments, see cupboard and drawer installation and repair, and for shelving, see shelf and cabinet installation.

Cabinetry: bright remodeled kitchen with stainless appliances
Cabinets, counters, lighting and appliances are planned together in a kitchen.

What our cabinetry service includes

  • Cabinet installation. Wall, base, tall and corner cabinets, levelled, fastened and aligned, with doors and drawers adjusted.
  • Adjustment and repair. Hinges, slides, doors, drawer boxes and damaged parts.
  • Refacing and refinishing. New doors and fronts, or new painted and stained finishes on existing cabinets.
  • Custom built-ins and vanities. Storage units, bookcases, window seats and vanities designed to fit.
  • Hardware upgrades. New handles, pulls, soft-close hinges and slides, pull-out organisers and accessories.
  • Layout planning. Help planning how cabinets will be used, with attention to access, clearances and services.
  • Coordination. Working with countertop makers, plumbers, electricians, appliance suppliers and flooring installers.

Understanding cabinet construction

Frameless (European-style) cabinets

Boxes are made of panels joined directly, with doors that cover the whole front. They give a clean, modern look and make full use of the interior, with wider drawer access. Doors are attached with concealed hinges to the sides of the box. They depend on the accuracy of the box and the strength of the panels.

Face-frame cabinets

A frame of solid wood is attached to the front of the box, and doors and drawers are mounted to the frame, either overlaid or set inside it (inset). The frame adds strength and a traditional look. The openings are slightly smaller than in frameless cabinets because the frame takes up space.

Box materials

  • Plywood. Layers of wood veneer glued with alternating grain. Strong, stable, and holds fasteners well. A common choice for quality cabinets.
  • Particle board. Compressed wood particles with resin, often covered in laminate or melamine. Economical, though it holds fasteners less well and swells if it gets wet.
  • MDF. A smooth, dense board suited to painted doors and panels, heavy, and vulnerable to moisture.
  • Solid wood. Used for frames, doors and some boxes. Beautiful and repairable, though it moves with humidity.
  • Metal. Used in utility and some modern designs.

Door and drawer fronts

  • Flat-panel (slab) doors. A simple, modern look, in wood, MDF, laminate or other materials.
  • Shaker doors. A frame with a flat centre panel, a popular and versatile style.
  • Raised-panel doors. A profiled panel for a traditional look.
  • Glass-front doors. A frame holding a glass pane, for display.
  • Thermofoil and laminate. A thin plastic layer over MDF, economical but sensitive to heat and moisture.
  • Painted finishes. Painted wood or MDF, available in many colours, with a hard-wearing finish.
  • Stained and clear finishes. Show the wood grain, with colour from stains and protective coats.

Drawer construction

Quality drawer boxes use solid wood or plywood sides, joined with dovetails, dowels or other strong joints, with a bottom panel set in a groove. Cheaper drawers may use thin materials and staples. The slides make the difference in feel: full-extension, soft-close slides on a sturdy box give a long life.

Stock, semi-custom and custom cabinets

  • Stock cabinets. Made in standard sizes, available quickly and relatively economical. Fillers and panels make up the difference when a run does not match exactly.
  • Semi-custom cabinets. Offer a wider range of sizes, styles and finishes, with modifications. Lead times are longer than stock.
  • Custom cabinets. Built to your design and the exact dimensions of the room, in the materials and finishes you choose. They offer the most flexibility and the longest lead times.
  • Ready-to-assemble (RTA) cabinets. Sold flat-packed, and assembled on site. Quality varies, and careful assembly and installation matter.

The best choice depends on your budget, timeline, the shape of the room and your priorities. We help you think through the options without pressure.

Refacing, refinishing or replacing: choosing the right approach

When refinishing makes sense

If the cabinet boxes are sound and the layout works, a new finish can transform the look. Painting or staining involves removing doors and hardware, cleaning, sanding, priming and applying durable coats. See residential painting for how we approach cabinet finishing. Refinishing cannot change the door style, so if you want a different style, refacing or replacement is needed.

When refacing makes sense

Refacing replaces doors and drawer fronts, and covers the visible faces of the frames or boxes with a veneer or similar material. It changes the style and colour while keeping the existing boxes, which saves demolition and keeps the layout and countertops in place. It depends on the boxes being structurally sound, and in good condition.

When replacing makes sense

Replacement is the right choice when boxes are water-damaged, sagging or poorly built, when the layout does not work or when you want a different configuration, such as a larger island, new appliance positions or more storage. It is the biggest project, and it often goes together with countertops, flooring, lighting and plumbing changes. See kitchen remodeling.

Questions to ask

  1. Are the boxes structurally sound, level and free of water damage?
  2. Does the layout work for how you cook, store and move?
  3. Do you want to change the style, or just refresh it?
  4. How long can you live without a kitchen or bathroom?
  5. Are you changing countertops, flooring or appliances at the same time?
  6. What is the age of the cabinets, and are replacement parts and hardware available?

Planning a layout that works

Good cabinet design starts with how you use the space, and not with the catalogue.

  • Work zones. In a kitchen, think in terms of zones: food storage, preparation, cooking, cleaning and serving. Place storage close to where items are used.
  • Clearances. Aisles need space for people to pass and for doors and drawers to open. Guidelines exist for aisle widths, distances between appliances and counters and clearances for dishwasher, oven and fridge doors. We check these against your room.
  • Counter space. Adjacent to the sink, stove and fridge, so that dishes and ingredients have somewhere to land.
  • Storage types. Deep drawers for pots, shallow drawers for utensils, pull-out shelves for items at the back, tall pantries for dry goods and corner solutions.
  • Heights. Everyday items between waist and shoulder, heavy items low, rarely used items high.
  • Appliances. Dishwasher, fridge, range and microwave sizes and clearances, with ventilation and power.
  • Services. Plumbing, electrical, gas and ductwork locations affect cabinet layout.
  • Light. Natural and electric light, including under-cabinet lighting.
  • Accessibility. Reach, grip and mobility, with pull-out features and easy-to-use hardware.

Measuring and site checks before ordering

Mistakes in measuring are expensive, because cabinets cannot easily be changed. Before ordering, we check:

  • Wall lengths and heights, measured in several places, since walls are not always straight or parallel.
  • Ceiling height and any bulkheads.
  • Window and door positions, including trim and swing.
  • Plumbing, electrical and gas locations, with the planned position of sinks, outlets and appliances.
  • Floor levels. The high point of the floor sets the base cabinet height reference.
  • Corners. Whether they are square, since out-of-square corners affect fit.
  • Existing conditions. Damage, moisture and structure behind existing cabinets.
  • Appliance specifications. The actual model’s dimensions and installation requirements.

How cabinet installation works, step by step

  1. Check the delivery. Every box, door, drawer, panel and accessory is checked against the order, and for damage. Problems are reported to the supplier immediately.
  2. Prepare the room. Old cabinets are removed, walls are repaired and painted if needed, and floors are protected. Services are marked and, where necessary, relocated by licensed trades.
  3. Find the high point of the floor and mark a level line for the base cabinets. Mark a second line for the wall cabinets, according to the plan.
  4. Mark stud locations across the wall, so that fastenings can be planned.
  5. Install the wall cabinets first, starting from a corner or a fixed point. A temporary support or ledger holds cabinets while they are levelled and fastened.
  6. Join cabinets together. Cabinets are clamped, aligned at the face and fastened to each other, then to the wall through the studs with screws suited to the load.
  7. Install the base cabinets. They are shimmed level on the floor, aligned with each other and fastened to the studs and to each other.
  8. Fit tall cabinets and corner units with care, since they carry heavy loads and affect the alignment of the rest.
  9. Cut openings. Holes for plumbing, wiring and ventilation are cut accurately.
  10. Install doors, drawers and hardware, then adjust hinges and slides for even gaps and smooth movement.
  11. Fit panels, fillers, toe kicks and mouldings. They close gaps and give a built-in look.
  12. Coordinate with the countertop installer, sink and appliances, and make any final adjustments.
  13. Final inspection. We walk through with you, touch up finishes and leave the room clean.

Details that make installation look professional

  • Level and plumb, not just fastened. Level base cabinets give a flat countertop, and plumb walls give true doors.
  • Even reveals. Gaps between doors and drawers are consistent.
  • Tight joints. Cabinet faces meet flush, without steps or gaps.
  • Scribed edges. Panels and fillers are cut to the wall’s irregularities, so that gaps are small.
  • Clean cut-outs. Holes for pipes and wires are neat and sealed where needed.
  • Consistent hardware placement. A template keeps handles aligned.
  • Protected finishes. Cabinets are protected during installation, and any chips are touched up.

Countertops, sinks and appliances: the coordination points

Cabinets are one piece of a larger puzzle. The countertop is usually templated after the cabinets are installed, and made to fit precisely, so cabinets must be level and secure first. Sinks, faucets and appliances need cut-outs and connections that match the cabinet plan. Plumbers and electricians often need to attend before and after cabinets are installed.

Flooring may go under or around the cabinets, and the choice affects the order of work and the height of the toe kick and dishwasher. We help coordinate these stages, so that each trade has what it needs when it needs it. For plumbing fixtures, see toilet and faucet installation.

Wooden wall shelves with plants above a sofa
Wall shelves look best when they are level and anchored for the load they carry.

Bathroom vanities and linen cabinets

Bathroom cabinetry faces moisture, so material choices matter.

  • Moisture-resistant materials. Plywood, moisture-resistant boards and sealed finishes hold up better than untreated particle board.
  • Vanity sizes. Standard widths suit many bathrooms, and custom vanities can use awkward spaces.
  • Sink and plumbing positions. The drain and supply positions affect drawers, and cut-outs need planning.
  • Countertops and backsplashes. Sealed and caulked at the wall to keep water out.
  • Floor-mounted or wall-hung. Wall-hung vanities need strong backing in the wall.
  • Linen and storage cabinets. Tall units need secure anchoring.
  • Ventilation. A good fan prolongs the life of every surface.

For whole-bathroom projects, see bathroom remodeling.

Custom built-ins, window seats and storage

Built-ins make the best use of awkward spaces, such as alcoves, under stairs and around windows and fireplaces. The design stages include discussing the uses, measuring, designing the layout and details, choosing materials and finishes, building and installing, and finishing. Details such as scribing to uneven walls, building in ventilation for equipment and allowing for lighting and outlets make the difference between furniture that looks added and cabinetry that looks like part of the house. See carpentry and TV and fireplace wall designs.

Hardware: handles, hinges, slides and accessories

  • Handles and pulls. Choose size, shape and finish to suit the style and the hand. Placement should be consistent.
  • Hinges. Concealed hinges are adjustable, and soft-close versions slow the closing. The type must match the overlay of the door.
  • Drawer slides. Full-extension slides give access to the whole drawer. Soft-close and under-mount slides improve feel and appearance. Weight ratings must suit the load.
  • Organisers. Pull-out trays, spice racks, waste bins, cutlery dividers and lazy Susans make storage more usable.
  • Lighting. Under-cabinet and in-cabinet lights add convenience. New wiring is done by licensed electricians.

Cabinet finishes and how they wear

  • Painted. Offers any colour, and shows chips and wear at edges over time. Quality preparation and hard coatings help.
  • Stained. Shows the grain. Colour variations in the wood are natural.
  • Clear-coated. Keeps the wood natural.
  • Laminate and melamine. Very durable surfaces that resist scratches and are easy to clean, with limited repair options.
  • Thermofoil. Seamless looks, vulnerable to heat from ovens and toasters, and to peeling.
  • Veneer. Thin real wood layers on a stable core, giving the look of wood with stability.

Sheen affects the look and the way marks show. Matte finishes hide fingerprints, and glossy ones reflect light and show them. Follow the manufacturer’s care instructions for each finish.

Moisture, heat and cabinet life

  • Sinks and dishwashers. Leaks and steam damage cabinet floors and sides. Check under the sink regularly, and use a heat shield or seal edges near dishwashers.
  • Ranges and ovens. Heat damages nearby finishes, and clearances and heat shields protect them.
  • Humidity. Seasonal swings move wood. Stable indoor humidity helps.
  • Ventilation. Range hoods that vent outdoors reduce grease and moisture.
  • Cleaning. Wipe spills promptly, and avoid soaking.

Cabinet lead times and ordering

Cabinets are often among the longest-lead items in a renovation. Planning around them keeps the project moving.

  • Confirm the design in writing with exact dimensions, door styles, finishes and accessories before ordering.
  • Get a delivery date and plan demolition and trades around it.
  • Check the order on arrival. Errors and damage are easiest to fix when found quickly.
  • Keep the old kitchen until the new cabinets are on site and checked, when practical.
  • Order extras. Spare doors, hinges and trims help with later repairs.

What affects the time and cost of cabinetry work

We do not publish prices, because cabinetry projects vary widely. The main factors are:

  • The number and type of cabinets, and the complexity of the layout.
  • The cabinet grade: stock, semi-custom or custom, and the materials and finishes.
  • Whether you are refacing, refinishing or replacing.
  • Removal and disposal of existing cabinets.
  • Wall and floor conditions, including repairs and levelling.
  • Services work: plumbing, electrical and gas relocation by licensed trades.
  • Hardware and accessories.
  • Countertops, backsplash and flooring coordination.
  • Access and delivery constraints.
Wooden frame of a new house under construction
A solid frame is where every addition and new build begins.

Common cabinetry mistakes

  1. Not measuring carefully. Errors are costly once cabinets are made.
  2. Choosing style before function. Beautiful cabinets that do not suit how you work are frustrating.
  3. Ignoring the floor. A floor that slopes means cabinets must be shimmed to a level reference.
  4. Fastening to drywall only. Heavy wall cabinets must go into studs or solid backing.
  5. Skipping fillers and panels in the plan. Gaps and awkward ends appear.
  6. Forgetting appliance clearances. Doors collide and ventilation is blocked.
  7. Under-specifying hardware. Cheap hinges and slides wear out quickly.
  8. Not protecting installed cabinets. Other trades damage them.
  9. Demolishing before delivery. A long wait with no kitchen.

How to prepare for a cabinetry project

  • List of how you use the room, what you store and what frustrates you now.
  • Photos, measurements and a sketch of the room, with services and appliances marked.
  • Decision on refinishing, refacing, replacing or custom built-ins.
  • Style, finish, hardware and accessories chosen, with samples viewed in your light.
  • Appliance models and countertop plans confirmed.
  • Lead times and delivery dates agreed in writing.
  • Plans for temporary kitchen or bathroom arrangements.
  • Licensed trades arranged for plumbing, electrical and gas.
  • Clear access for delivery and installation.
  • Pets and children kept away from work areas.

Caring for your cabinets

  • Wipe with a soft cloth and mild soap, and dry the surface after cleaning.
  • Avoid abrasive pads and strong solvents.
  • Clean grease from around the stove regularly.
  • Check under sinks for leaks from time to time.
  • Tighten loose hinges and handles early, and adjust doors and drawers when they drift.
  • Do not overload shelves and drawers beyond their ratings.
  • Keep touch-up paint or stain labelled, for chips.

Frequently asked questions in more detail

Can existing cabinets be reused in a new layout?

Sometimes. Cabinets can be moved if they are sound and sized to fit the new plan. Removing and reinstalling them requires care, and matching missing parts may be needed.

Can you change the height of cabinets?

Wall cabinet heights can sometimes be adjusted, and filler pieces or risers can be added. Base cabinet height is more fixed. We check the plan and the ceiling.

What about painting vs. new doors?

Painting changes colour but not style. New doors change style as well. If the boxes are in good shape, new doors with a fresh finish give a dramatic update.

Do you remove and dispose of old cabinets?

Yes, if included in the estimate. Removal creates dust and waste, and in older homes, may involve hazardous materials such as lead paint. We plan protection and disposal.

How long does installation take?

It depends on the number of cabinets, the layout and the finishing. Installation is typically a matter of days, with countertops, plumbing and electrical following. We give a schedule with the estimate.

What if my walls and floors are uneven?

Most are. Shimming, scribing and fillers deal with the differences, so cabinets are level and look built-in.

Can you match existing cabinets when adding to a run?

It depends on whether the product is still available. Matching finishes on old cabinets is difficult, and sometimes refinishing the whole run gives the best result.

Do you install cabinets in commercial spaces?

Yes. Break rooms, reception counters, medical offices and retail all use cabinetry. We plan around business hours and building rules.

Cabinets and the rest of the renovation: getting the order right

Cabinets sit in the middle of the renovation sequence, and the order matters. Walls need to be repaired, painted or at least primed before wall cabinets go up, because it is much harder to paint behind them. Flooring decisions affect height: whether the floor runs under the cabinets or stops at their edge changes the toe-kick height, the dishwasher opening and the options for replacing the floor later.

Electrical and plumbing rough-ins must be in place before cabinets are fastened, and the final connections follow after the countertops are on. Backsplash tile goes in after the countertop. Trim, crown moulding and lighting come last. A short written sequence, agreed in advance with each trade, avoids the situation where one trade has to undo another’s work.

Warranty, records and spare parts

Cabinet makers and hardware manufacturers publish their own warranties, which have conditions attached, such as correct installation and normal use. Keep the order confirmation, the door style and finish names, the hardware model numbers and the care instructions together in your home file. Ask the supplier for a spare door, a few hinges and a drawer slide if the design is likely to be discontinued, and keep a small labelled sample of paint or stain for touch-ups.

When something needs repair years later, these details make matching parts far easier. If a defect shows up soon after installation, photograph it and tell us and the supplier promptly, so that it can be looked at while the details are fresh.

Official guidance: For independent consumer information in Ontario, see Consumer Protection Ontario.

Cabinetry in London, Ontario

Tell us about the room, how you use it and what you would like to change. We will visit, take measurements and give you a clear written estimate. You can call 519-494-3673, message us on WhatsApp or use the contact form for a free consultation. For wider projects, see kitchen remodeling, bathroom remodeling and home renovation.

Before we start

A little preparation makes cabinetry go more smoothly. Photos, a short description of the problem or project and any plans, permits or previous reports you have.

Serving London, Ontario

We work with homeowners, landlords and businesses across London, Ontario and the surrounding area. Call 519-494-3673 or request a free consultation. You can also browse all of our services.

Frequently asked questions

How much does cabinetry cost in London, Ontario?

Pricing depends on the scope and on whether a licensed trade is required. We tell you plainly which parts we do ourselves and which are handled by licensed professionals, and we quote them clearly. Call 519-494-3673 or send a message for an estimate for your address.

How long does cabinetry take?

Timing depends on scope, permits where required and trade availability. We give you a realistic schedule after reviewing the job and keep you informed of changes.

What should I have ready before booking cabinetry?

Photos, a short description of the problem or project and any plans, permits or previous reports you have.

What should I know about cabinetry before we start?

Refacing can transform a kitchen at a fraction of the cost of replacing every cabinet.

Do you use licensed tradespeople when the work requires it?

Yes. Where a job calls for a licensed trade, such as plumbing, electrical or HVAC work, we say so plainly and bring in licensed professionals in line with Ontario requirements.

What is the difference between refacing, refinishing and replacing cabinets?

Refinishing keeps the existing doors and boxes and gives them a new painted or stained finish. Refacing replaces the doors and drawer fronts and covers the visible parts of the boxes with new material. Replacing removes the cabinets and installs new ones. The right choice depends on the condition of the boxes, the layout and what you want to change.

Can you install cabinets that I buy from a retailer?

Yes. Retail, ready-to-assemble and custom cabinets all need accurate installation. Send us the product details or plans, and we will check the layout, the order of installation and anything that needs special attention, such as fillers, panels and corner units, before delivery.

Can you build custom cabinets and vanities?

We build custom built-ins, vanities and storage within the scope of site and shop carpentry, designed to fit the space. For large, fully custom kitchens, we explain what we can do and whether a specialist cabinet maker is a better fit for your project.

How long do cabinets take to arrive?

Lead times vary a great deal between stock, semi-custom and custom cabinets, and between suppliers. We recommend ordering early, confirming the delivery date in writing and not demolishing the old kitchen until the new cabinets are on site and checked.

Can you adjust or repair sagging doors and drawers?

Yes. Many cabinet problems are solved with hinge and slide adjustments, tightened or repaired screw holes and new hardware. See our cupboard and drawer repair page for details. If boxes are water-damaged or falling apart, we tell you honestly when replacement makes more sense.

Last updated

Free consultation

Tell us what you need and get a clear, written estimate.

Ready to start your project?

Book a free consultation. Tell us what you need and we will get back to you with clear next steps.